With 4 days left in the build season, the MARS team is hard at work. Saturday night Jan 30 saw the first full power tests of the kicking system on a driving robot frame. Follow this link to the team MARS facebook page for some video of the kicking system at work http://www.facebook.com/#/group.php?gid=8167857556&ref=nf. Still under fabrication are the robot lifting system and the ball capture system. Go MARS ! Full system integration occurred on Feb 8th and here is some video demonstratiing the latest capabilities http://www.youtube.com/watch?v=maKt-1ixIaY